| |
|
Our Process
Way Out West, Inc. believes in the practices of Kaizen, the philosophy of continuous improvement. WOW staff makes a daily effort to incrementally improve processes and services which ultimately yields a quality product for you at a competitive price, on or before your requested delivery date. In order for WOW to make the best product for you, we have created a step by step process to help aid in the design, development and manufacture of your product.
|
STEP 1 |
 |
Online Questionaire |
|
 |
Please fill out the online questionaire outlining your product, timeline and quantities. Please include photos and website links to your product if available. Our qualified staff will promptly review your Product Line and determine if we have the proper equipment and time available for your products.
If our staff identifies that it is within our capabilities, we will contact you for a product consultation and determine which stage your project is at.
 |
Instructions: Click the link on the left to download the Product Questionaire PDF. Once completed, please email the form along with any relevant attachments to: products@wayoutwestinc.com |
|
STEP 2 |
 |
Product Development and Costing |
|
 |
| Stage 1: Concept Development |
Cost
/hr. |
A. Product Design and Development Consultation. What we need from you:
- Design Sketch, rendering, photo
- preliminary material selection (material swatches)
|
|
B. Product Design and Development
(Deposit: Minimum 8 hours) |
$75 |
| |
|
| C. WOW Sample Creation based on consultation |
|
| Sample construction |
$75 |
| Patterns, upon sample approval |
$50 |
| |
|
| D. WOW Labor Quote |
|
| |
|
E. Sourcing Materials:
Customer or WOW |
$60 |
Procure Materials for Prototype
from Step 2E Source |
$45 |
| |
|
F. Production Prototype
and Customer Approval |
$75 |
| |
|
| G. WOW final costing for production of product (Volume Breakdown Pricing) |
|
| Stage 2: Sample Refinement |
Cost
/hr. |
A. Product Refinement Consultation.
What we need from you:
- Existing sample
- Proposed changes
- Patterns (if available)
- Proposed Materials (Material swatches)
|
|
B. Product Design and Development
(Deposit: Min 4 Hrs.) |
$75 |
| |
|
| C. WOW Sample Creation based on consultation |
|
| Sample construction |
$75 |
| Patterns, upon sample approval |
$50 |
| |
|
| D. WOW Labor Quote |
|
| |
|
E. Sourcing Materials:
Customer or WOW |
$60 |
Procure Materials for Prototype
from Step 2E Source |
$45 |
| |
|
F. Production Prototype
and Customer Approval |
$75 |
| |
|
| G. WOW final costing for production of product (Volume Breakdown Pricing) |
|
| Stage 3: Manufacture Existing Product |
Cost
/hr. |
A. Product Consultation:
What we need from you for Stage 3:
- Existing sample
- Proposed changes
- Patterns (if available)
- Technical Drawings
- Minor Modifications
|
|
| B. WOW Reverse Engineering of Product |
|
| |
|
| C. WOW Sample Creation based on consultation |
|
| Sample construction |
$75 |
| Patterns, upon sample approval |
$50 |
| |
|
| D. WOW Labor Quote |
|
| |
|
E. Materials:
Customer provides current material source |
|
Procure Materials for Prototype
from Step 2E Source |
|
| |
|
F. Production Prototype
and Customer Approval |
$75 |
| |
|
| G. WOW final costing for production of product (Volume Breakdown Pricing) |
|
|
STEP 3 |
 |
Preproduction |
|
 |
A purchase order must be submitted based upon cost and minimum quantity per WOW Quote.
WOW or customer will purchase materials per WOW Quote.
|
STEP 4 |
 |
Manufacturing |
|
 |
Once Way Out West has the Purchase Order and payment per Terms in WOW Quote, a Lean production line will be formed to manufacture your product and a total production timeframe will be estimated
Product will be built to specifications determined in the Production Prototype run.
Product will be packaged according to WOW Quote.
Product will be shipped FOB Gardena, CA.
|
|
|